Preproduction inspection. One package of lamps, produced using the same tooling, production, and assembly methods that are used for production lots, shall be submitted for examination and test in accordance with the above requirements. Documentation consisting of the certification and test data shall be presented for examination during performance of the preproduction inspection. Failure of the preproduction samples to pass the examination of one or more of the tests, the lack of required documentation, or failure of the documentation to substantiate conformance to the requirements of this CID shall be cause for rejection.
Notes. ANSI Standards C78.3 and C78.375 are available from the American National Standards Institute, Inc., 1430 Broadway, New York, New York, 10018.
The commercial item certification clause is not required when this commercial item description is used for procurement.
Military Coordinating Activity
None. DoD has waived coordination
on this commercial item description
until further notice.
PREPARING ACTIVITY:
GSA – FSS
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business